• A Loop

    1,121
  • B Loop

    1,049
  • NS Line

    2,440
  • Total

    4,610
  • Total YTD: 635,824
  • Target not to exceed

    0.65
  • Actual

    0.70
  • Target

    $180
  • Actual

    $184